what a difference a day makes. Cecil and I went to the house to get some boxes out of the barn. when we got there, there was concrete being poured for another portion of the driveway and being covered by heated blankets. (the weather was going to turn and become cold and snow), there were stone workers veneering the side of the house and retaining walls and plaster workers putting texture on the walls. it was a busy place and what a change that was made in one day.


the additional driveway that was poured and covered


more stone unloaded at the front of the house. the walk way in front of the house was poured


the texture was being applied in the main living area. the walls were so white.


look from the stairs towards the kitchen


looking up from the basement to the main level. the bottom of the stairs was drywalled


look at the basement living area


stone veneer being applied to the bench wall


the posts were originally going to be square at the base, but the base had to be 2 feet by 2 feet. that made the columns really large. in some areas, it looked like a wall of stone. so the guys came up with this column detail. the bottom is still 2x2 to cover the pipes and concrete but doesn't look so large at the top

the large square columns


the stone added on the south wall at the patio


the south side of the house


Cecil checking out the retaining walls and the bench wall.


the retaining wall from the east side of the house to the south side of the house. that is the door to the garage. steps from the deck will take you to the flagstone landing. you can either go up steps to the north to the driveway or down steps and to the right to the patio