Tuesday, November 4, 2008

house 11-4-08

today there are only a few cars parked in front of the house, yesterday when i did not have the camera, there were probably 20 cars in front of the house. lots of people working on the house.


the wood floor planks are delivered


the tubing being laid for the snow melt


the retaining wall for the patio


the stamped concrete for the patio is poured on the west side of the patio


the east side of the patio leveled and readied for concrete. it is supposed to snow tomorrow. hopefully concrete will be poured on friday.


another look at the stamped concrete


the sheet rock is in, now the taping is going on





the opening from the main floor to the basement


the basement kitchen area walled off


work is going on with the trex decking being installed and a flagstone landing for the steps from the deck down to the patio


the steps from the driveway to the flagstone landing


when the inspection took place, we were told that the previous window well did not meet code. the window well was dug out and enlarged. a new window well was installed with a ladder and metal cover.




the outside of the house was painted. the siding was painted with a cream color and the trim was a beige color. the accent color is blue on the shutters and doors.

door from the laundry room to the deck



the trex decking is being installed.