the garage and the drive way concrete was poured
the snow melt was placed in a walk way to the barn and in front of the barn. concrete will be poured there at a later date
the back yard is a definite concstructions site,
the stone veneer for the side of the house.
Chris walking on the bench wall for the patio. it is on top of the retaining wall
the decking being installed
Cecil checking out the stamped concrete and deck. framing for the posts is started
the retaining walls and the steps are ready for the stone veneer on the east side of the house