there was lots going on at the house. the drywallers were spraying the walls and ceilings with the first layers of primer and whatever they put on to hold the texture. the house was totally sealed off and the air was so thick that it was hard to breathe so there are not any pictures of the inside except for this one of Cecil in the storage area.

the garage and the drive way concrete was poured


the snow melt was placed in a walk way to the barn and in front of the barn. concrete will be poured there at a later date


the back yard is a definite concstructions site,




the stone veneer for the side of the house.


Chris walking on the bench wall for the patio. it is on top of the retaining wall


the decking being installed


Cecil checking out the stamped concrete and deck. framing for the posts is started


the retaining walls and the steps are ready for the stone veneer on the east side of the house