the main living room all textured and ready to paint
the stairs as seen from the dining room
the entry way and the main living room
the bench walls are veneered, the mantel for the fireplace in the main living room and the basement living area are being carved
the grout is being applied to the stone veneer on the retaining walls and the stone is being glued to the wall on the side of the house
Parker and Scott are starting on the deck rails
closer look at the stone on the front of the house that has been grouted and the cap put on
the stone being applied to the front of the house. the garage is sealed off so that the texture could be applied
the drive way was uncovered since the weather has warmed up. hopefully the rest of the driveway concrete will be poured tomorrow.
the side of the garage
the east side of the house