Saturday, January 31, 2009

house 1-31-09

.house update for the end of January. lots going on and it looks like we may be in the house in about three weeks. we are ready. the house is looking great.


the back of the outdoor fireplace. looking west at the deck and patio


the front of the outdoor fireplace looking east


the stairs on the south side of the deck are in


the stairs on the west side of the deck are being put in


the stairs in the entry way


the upstairs bedroom on the west side of the house is finished except for the carpet


the built ins in the bedroom on the west side


the bathroom to the bedroom on the west side of the house upstairs


the tub/shower in the bathroom on the west side bedroom


the built ins in the hallway upstairs


the breakfast nook on the main floor


closer look at the wainscotting in the breakfast nook


the back splash in the kitchen is being put in


tim and matt, put in the tile in the house, they did a great job


closer look at the back splash in the kitchen, it has the same colors as in the medallion over the stove top


the cabinet panels are on the refrigerator and freezer


the bench in the laundry room is finished. Cecil loves it. the coat hooks are really great


the washer and dryer are in

No comments: