there is lots going on at the house. trim is still going up and being stained. tile going in. plumbing fixtures being installed. the stairs inside and outside are being finished and the rails and balusters installed. the look of the house changes daily.

frank putting in the plumbing fixtures in the master shower and bath

the mantle was installed over the stove top and the tile is being installed in it. there will be a pot filler in this space

a look at the kitchen from the living area

closer look at the tile and medallion over the stove top. the hole is where the pot filler will be connected

in the laundry room. this is a folding area for clothes. there will be a shelf with a coat rod to hang clothes on above the counter

this is in the laundry. the bench will have coat hooks for hats and coats and there will be plastic trays under the bench for wet boots and shoes. there will baskets on top for gloves, scraves and hats.

the balusters and rails are in the stairs

balusters being put in

a look at the balcony rails and balusters