I have not updated the progress on the house in a while. as of last Tuesday, all rough in inspections have been passed, YEA!!! The insulation of the walls began. Friday, work on the retaining walls for the back patio began. work on the rain escape (to keep the patio beneath the deck dry) has been going on. the driveway was widen and recycled asphalt applied. road base was laid for the concrete area of the driveway. lots going on. the cabinets are in and in storage. the wood floors are in route for delivery next week. the sun room doors are scheduled for installation for next week and dry wall is going up soon.

the front of the house after the rest of the new windows were installed.

Cecil checking out the sun room, his favorite room


two black cats have shown up and adopted the house. they are definitely not afraid of people. they walked around like they owned the house and who were we to disturb them.




the propane tanks were totally covered. the posts won't remain but are there for protection of the tanks while construction is going on

the road base will eventually be concrete. the asphalt driveway will come up to the concrete. Cecil had asphalt put beside the barn for parking of trailers.

Cecil checking out the new driveway

lots of dirt and grading went on to level out the driveway and make it wider. recycled asphalt was laid from the house to the street


we have a wonderful walk out basement because the house is built on the top of a slope. but to have a flat patio, this causes a bit of a problem. to remedy this, retaining walls need to be put in for the dirt to be level. first earth has to moved away for concrete footers to be poured. then the walls will be built on them.

above the west side of house. below the south side of house

east side of house looking west

hard at work


insulation is going in everywhere. spray foam insulation was used in the exterior walls. the pink fiberglass was used everywhere else. it sure made the house more sound proof.
the old garage which will be the new study/craft room.

the interior walls of the craft room/study

Cecil inspects the basement play room

the living area of the main level


the rain escape is installed between the joists of the deck. the decking will go above and cedar roofing material below. water will be channeled to the downspouts and through a series of gutters.
looking up at the underside of the rain escape.

looking out the laundry room back door to the sun room

closer look at the downspouts of the rain escape