the front of the house after the rest of the new windows were installed.
Cecil checking out the sun room, his favorite room
two black cats have shown up and adopted the house. they are definitely not afraid of people. they walked around like they owned the house and who were we to disturb them.
the propane tanks were totally covered. the posts won't remain but are there for protection of the tanks while construction is going on
the road base will eventually be concrete. the asphalt driveway will come up to the concrete. Cecil had asphalt put beside the barn for parking of trailers.
Cecil checking out the new driveway
lots of dirt and grading went on to level out the driveway and make it wider. recycled asphalt was laid from the house to the street
we have a wonderful walk out basement because the house is built on the top of a slope. but to have a flat patio, this causes a bit of a problem. to remedy this, retaining walls need to be put in for the dirt to be level. first earth has to moved away for concrete footers to be poured. then the walls will be built on them.
above the west side of house. below the south side of house
east side of house looking west
hard at work
insulation is going in everywhere. spray foam insulation was used in the exterior walls. the pink fiberglass was used everywhere else. it sure made the house more sound proof.
the old garage which will be the new study/craft room.
the interior walls of the craft room/study
Cecil inspects the basement play room
the living area of the main level
the rain escape is installed between the joists of the deck. the decking will go above and cedar roofing material below. water will be channeled to the downspouts and through a series of gutters.
looking up at the underside of the rain escape.
looking out the laundry room back door to the sun room
closer look at the downspouts of the rain escape