Saturday, September 20, 2008

house progress 9-19-08

we went out to the house Friday and there was a lot of work going on. The electricians were laying the new power lines from the source to the house. We found deep trenches dug to the house and to the barn and lines for the propane, telephone, electric power and other things being laid. The wiring for the house was still in progress. The front door had been framed in.
The front door won't be put in until the last. A plywood front door was made and placed in the door frame.


Lines being tied into the main power at the front of our property


trenches to the barn and to the house. I was surprised at how deep they were


lines being hooked to the house


Cecil checking out the trenches and the lines laid in them


Cecil checking out the frame to the new front door


wiring being put in to the 2nd floor bathroom


wiring being put into a 2nd floor bedroom


shower pan poured for the mud room bathroom


they are getting ready to install the bathtub in the master bath


shower pan poured for the master bath shower