the front porch opening was moved for the front doorway. we should be getting the front door next week.
Frank and Brett were putting in gas lines.
the dining room walls were framed in as were other walls and closets
the shower pan being poured. this is the shower in the mud room bath.
Duffy working on the valves for the radiant heat
the air handlers are being installed. the units move the cold air and the heated air through the house. there are three units: one for the basement, one for the main floor and one for the second story
the electrical boxes are being installed and wire is started to being run through the house
the back wall of the house as well as the other walls of the house are made ready for the stone to be attached. that is a black felt material with a wire mesh over it
my favorite, instead of a closet under the basement stairs, we will have a small playhouse. those are the two windows that will be on the side, the door at the end will be two small swinging doors like those in the western movies.