we are getting windows and siding. this is the
bay window in the dining room
this is the window to the craft room/study
the deck is being framed on the back of the house.
looking out of the laundry room door to the sun room
the deck at the sun room upstairs and windows in the walk out basement
the roof is being put on, it is an asphalt shingle roof
cecil wanted a blue roof and i wanted a grey roof,
so we compromised on the quarry slate color which
is a mixture of both.
the radiant heat is being installed below the floor on the main floor.
No comments:
Post a Comment